undefined
+
  • undefined

CVD Equipment for Preparing Molybdenum Sulfide Using the 1200℃ Front-End Preheating Method, Model BTF-1200C-III-S-400C-D

Equipment Model: BTF-1200C-Ⅲ-S-400C-D Equipment Overview: This CVD system for molybdenum sulfide synthesis, employing a front-end preheating method, comprises a preheating furnace, a three-zone tubular furnace, a low-vacuum unit, and a gas supply system. The front end is equipped with a preheater capable of reaching 500°C, facilitating the evaporation of sulfur powder, while the rear end features a three-zone sulfidation furnace offering precise temperature control and user-friendly operation. Additionally, the system incorporates a three‑channel mass flow meter configuration to accurately regulate the gas flow rates required for experiments, and the low‑vacuum unit ensures efficient pumping to achieve the desired vacuum conditions.

Keywords:

Close
  • 产品对比
Total X Clear all
  • Product Information
  • Product Video
  • Experimental Case
  • Accessories and Consumables
  • Heating system

    ·   Rated voltage: AC 208-240V Single Phase, 50/60 Hz; Rated power: 7 kW

    ·   Maximum temperature: 1200℃

    · Continuous Operating temperature: ≤1100℃

    · Recommended heating rate: 15°C/min

    · Furnace tube specifications: high-purity quartz tube, Φ80 mm

    · Heating zone length: 200 + 200 + 200 mm; constant-temperature zone length: 300 mm.

    · Temperature control method: fuzzy PID control and self-tuning regulation, with intelligent 30-segment programmable control and over-temperature and thermocouple‑open‑circuit alarm functions.

    · Heating element: resistance wire

      

    Preheating System

    · In molybdenum disulfide experiments, the front-end preheater can heat and evaporate solid sources such as sulfur and phosphorus.

    · Model: BTF-500C

    · Voltage: 220V, Rated Power: 800W

    · Maximum temperature: 800℃

    ·   Operating temperature: 500℃

    · Maximum heating rate: 30°C/min

    · Recommended heating rate: 10°C/min

    · Heating element: resistance wire

    · Temperature control method: Intelligent 30-segment programmable control

    · Temperature control accuracy: ±1℃

    Gas supply system ( Route 3)

    · This gas supply system enables the controlled mixing and proportioning of three gases at varying flow rates, and can be equipped with a gas‑washing unit to meet experimental requirements. The mass flow meters are housed in a sealed, mobile cabinet and are connected via ultra‑clean, double‑polished stainless steel tubing fitted with precision double‑ferrule fittings. The system is operated via a touch‑screen interface and, when combined with various vacuum tube furnaces and vacuum units, forms a CVD system.

    · Operating voltage: 185~245V   50 Hz, maximum output power: 18 W

    · Air inlet and outlet: One line is for air intake, and two lines are for air output; among these, the gas from the two lines passes through mass flow meters into a mixing tank for blending before being discharged, while the gas from one line enters a mass flow meter and is discharged separately.

    · Operating temperature: 5–45°C

    · Working pressure differential: 0.1–0.5 MPa

    · Maximum pressure: 3 MPa

    · Accuracy: ±1.5% F.S.

    · Pressure vacuum gauge: −0.1 to 0.15 MPa (0.01 MPa/division)

    · Gas mixing tank: Φ80 x 120mm

    · Shut-off valve: Φ6mm

    · Dimensions: 600 x 600 x 650 mm

    Low-fidelity unit

    · The VAU-02 is a low-vacuum unit that houses one mechanical pump and one composite vacuum gauge, and includes accompanying components such as bellows, manual butterfly valves, clamps, and other connecting fittings.

    · Relative air humidity: ≤85%

    · Power supply: 220V ±10%, 50–60 Hz; Power: 1 kW

    · Pumping speed: 10 m³/h

    · Ultimate vacuum: 4 x 10 -2 Pa

    · Experimental vacuum level: 1.0 x 10 -1 Pa

    · Inlet/Outlet Connection: KF25

    · Oil capacity: 1.1 L

    · Rotational speed: 1450 rpm

    · Noise: 50dB

    · External dimensions: 600 x 600 x 650 mm

    Vacuum gauge parameters

    · Model: PPG-800K

    · Scope of Application: Suitable for applications involving various gases, or even gas mixtures.

    · Measurement range: 1.0 × 10 -3 ~ 1.33 x 10 5 Pa

    · Measurement accuracy: 1.33  ×  102 ~ 1.33  ×  105 ±0.15% of full scale

    · Installation direction: Arbitrary and unrestricted

    ·   Voltage: 18–30 VDC, Power: 1.4 W (2 W when powered on)

    · External dimensions (including the regulating tube): 48  ×  30  ×   68 (93) mm

    Exhaust Gas Treatment System

    · For the two-stage exhaust gas treatment system, the first stage is equipped with a liquid-seal safety vessel, while the second stage uses an NaOH solvent absorption vessel.

    ·   The bottle body is made of 304 stainless steel, with an internal PTFE coating.

    Warranty period

    ·   One-year warranty, lifetime maintenance.

    · Consumable parts such as thermocouples, sealing rings, and furnace tubes are not included.

    · Damage caused by human error or by the use of corrosive and acidic gases is not covered under warranty.

    Precautions

    ·   The internal air pressure must not exceed 0.02 MPa (gauge pressure).

    ·   For experiments involving sample heating, it is not recommended to operate the system with both the vacuum valve and the inlet valve at the furnace tube flange closed. If it is necessary to close these valves during heating, continuously monitor the pressure gauge; if the pressure exceeds 0.02 MPa, immediately open the vent valve to prevent accidents such as rupture of the furnace tube or ejection of the flange.

    ·   If, due to process requirements, flammable, explosive, or toxic gases must be used, you are responsible for implementing all necessary safety and explosion‑proof measures. Our company shall not be liable for any issues arising from improper operation during the use of such gases.

    ·   As the furnace is used over time, minor cracks may develop; this is normal, and the cracks can be repaired with an alumina coating.

Consultation Message