undefined
+
  • undefined

Multi-walled carbon nanotube growth equipment BST-1200C-CVD

Equipment Model: BST-1200C-CVD (Annual Production Capacity: 2 tons)

Keywords:

Close
  • 产品对比
Total X Clear all
  • Product Information
  • Product Video
  • Experimental Case
  • Accessories and Consumables
  • Key Features

    · The gas is first preheated in a gas preheater before entering the fluidized-bed reactor, thereby minimizing the impact of large volumes of cold gas on the process.

    ·   The reactor outlet is equipped with an agitator to prevent carbon tubes from becoming clogged at the outlet.

    ·   A temperature-sensing thermocouple is installed near the liquid inlet, enabling control of the inlet temperature.

    ·   The liquid inlet is adjustable, allowing its vertical position to be modified according to the temperature requirements of the process.

    ·   The collector’s exhaust port is fitted with a rotatable filter screen to prevent clogging.

    Main Parameters

    (Customizable according to process)

    ·   Operating temperature: ≤1100℃

    ·   Heating zone length: 300 + 300 + 300 + 300 + 300 mm (5 temperature zones)

    · Length of the gas preheating furnace heating zone: 300 + 300 + 300 mm

    · Furnace tube specification: quartz tube Φ 300 mm (outer diameter)

    · Heating element: resistance wire

    · Preheating furnace heating element: resistance wire

    · Preheating furnace coil material: 310S

    Control system

    · Temperature Control System: 30 programmable temperature‑control segments, with auto‑tuning of PID parameters, and an LCD touch‑screen interface.

    ·   Electrical Control System: PLC + Tablet Touchscreen Control System

    ① Temperature Control System: Controlled by a PLC and a touch-screen computer, it employs thermocouples and a temperature controller to regulate power output, thereby managing the mold temperature. The touch-screen computer automatically records the sintering process and historical curves. Equipped with a PLC controller, it features PID control and over-temperature alarm functionality, enabling data storage and output, and providing a clear overview of the furnace’s operating status.

    ② The control system software is independently developed by our company, featuring a user-friendly human–machine interface, simple operation, and rapid response. It enables real-time monitoring of furnace operating conditions and ensures stable, reliable performance.

    ③ This equipment can automatically acquire temperature, gas‑supply, and vacuum‑level curves, and dynamically display each process parameter (temperature, gas supply, and vacuum level), enabling users to analyze the sintering process based on historical trends.

    ④ The control system is equipped with categorized alarm functions for overcurrent, overheating, and other conditions, and also features a communication interface.

    · Temperature control accuracy: ±1℃

    Gas delivery system

    · The interior is equipped with five high-precision mass flow meters, enabling precise control of gas flow and compliant blending according to specified ratios.

    · Accuracy: ±1.5%

    · Linearity: ±0.5–1.5%

    · Repeatability: ±0.2%

    · Response time: for gas characteristics, 1–4 seconds; for electrical characteristics, 10 seconds.

    Vacuum pump

    · Pumping speed of the forepump: 60 m³/h

    Warranty period

    ·   One-year warranty, lifetime maintenance.

    · Consumable parts such as thermocouples, sealing rings, and furnace tubes are not included.

    · Damage caused by human error or by the use of corrosive and acidic gases is not covered under warranty.

    Precautions

    ·   The gas pressure inside the quartz tube must not exceed 0.02 MPa (gauge pressure).

    ·   Due to the high internal pressure of the gas cylinder, a pressure-reducing valve must be installed when introducing gas into the quartz tube. To ensure safety, it is recommended to use a pressure-reducing valve with a rated pressure below 0.02 MPa.

    ·   For experiments involving sample heating, it is not recommended to operate the system with both the vacuum valve and the inlet valve at the furnace tube flange closed. If it becomes necessary to close these valves during heating, closely monitor the pressure gauge; if the pressure exceeds 0.02 MPa, immediately open the vent valve to prevent potential accidents, such as rupture of the furnace tube or ejection of the flange.

    ·   Customers are advised against using flammable, explosive, or toxic gases. If such gases are unavoidably required for process reasons, please implement all necessary safety and explosion‑proof measures on your own. Our company shall not be held liable for any issues arising from the use of flammable, explosive, or toxic gases.

Consultation Message